Machine Assembly Order
- Base Frame + attic
- Working from the Back
- Preliminary Wiring
- Pan Motor
- Humidifier Drain Tank
- First oven-half + some wiring
- sensors
- 2 Thermocouples
- Proofing Sensor
- Pan Sensor
- Elements
- 2 Oven Elements
- 2 Proofing Elements
- Pre-Proofing Element
- Humidifier Tank
- Second oven-half + some wiring
- sensors
- 2 Thermocouples
- Proofing Sensor
- Elements
- 2 Oven Elements
- 2 Proofing Elements
- Pre-Proofing Element
- Humidifier Tank
- Hot water tank + air pump
- Finish Oven
- Drums
- Sprockets
- Chain
- skin
- oven doors / glass panels
- Working from the Front
- Mixer Pots Just post, no doors or motors
- Batching Table
- Ensure enough wiring and plumbing is completed
- Hoppers include the motor
- Adjust "the stack": pots, batching, hoppers
- HMI and water chambers
- Plumbing from Below
- Electrical and Senors from the top
- Finish the Mixer Pots and Hoppers
- Mixer Pot Shafts and Drive Motor
- Mixer Pot Doors and stepper motors
- Mixer Blades
- Hopper Blades and chain
- Hopper Sensors
- Forming System
- Independent Assemblies
- Enclosure
- Work Station
- Shelves
- Cooling Belts
- Tilter
- Tables
- In Store
- TV's with stands
- Mast
- Enclosure Glass